View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
A paper-based illustration representing WSJF with its core stages and visible working result.
Agile
WSJF
Paper illustration for Alignment Mapping.
Facilitation
Alignment Mapping
Software Architecture Canvas method illustration showing its working structure
Architecture
Software Architecture Canvas
Paper illustration of Power-Interest Grid with a method-specific labelled workspace.
Facilitation
Power Interest Grid
Purposedifferent
When many tasks compete for the same capacity, it orders work by economic impact. It makes time lost, benefit, and effort comparable together.When several people work toward one goal but hold different mental maps, Alignment Mapping makes the discrepancies visible. It arranges goals, assumptions, and priorities so shared direction becomes verifiable.The Software Architecture Canvas reduces a system to the most important architecture decisions, constraints, and interfaces. It is useful when teams need a resilient overall picture quickly.When many stakeholders compete for attention at once, the Power Interest Grid sorts them by influence and stake. It turns individual contributions into a visible selection. The result is captured as a Power Interest Grid and a stakeholder-specific strategy.
Complexitydifferent
HighMediumLowLow
Timedifferent
45-90 min1-2 h1-2 h30-60 min
Participantsdifferent
3-104-123-102-8
Formatsame
WorkshopWorkshopWorkshopWorkshop
Outputdifferent
Ranked Backlog, Cost-of-Delay AssumptionsAlignment Map, Open Issues, Decision QuestionsArchitecture Canvas, Goals, Constraints, Quality AttributesPower Interest Grid, Strategy per Stakeholder
Tagsno overlap
LeanEconomicsSequencePrioritization
AlignmentStakeholdersStrategyFacilitation
CanvasArchitectureAlignmentWorkshop
StakeholdersFacilitationAlignmentPlanning
Add more methods