methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Visual Management workspace showing the question, observations, and next decision.
Operations
Visual Management
Paper illustration for Kaizen Event.
Operations
Kaizen Event
A paper-based illustration representing WSJF with its core stages and visible working result.
Agile
WSJF
Paper illustration of Cost of Delay with its method-specific working model.
Delivery
Cost of Delay
Purposedifferent
With high tempo and many parallel topics, the method makes status, deviations, and priorities visible at a glance. It reduces search effort and prevents what matters from getting lost in daily work.For a tightly scoped process segment with noticeable waste, the method bundles shared energy for change. It suits situations that call for fast learning loops and visible adjustments.When many tasks compete for the same capacity, it orders work by economic impact. It makes time lost, benefit, and effort comparable together.Helps clarify scope, order, and delivery flow in concrete terms. It makes work, constraints, and sequence manageable. The result is captured as a Cost of Delay table and prioritization sequence.
Complexitydifferent
LowMediumHighHigh
Timedifferent
Ongoing0.5-5 Tage45-90 min90-180 min
Participantsdifferent
1-204-103-103-8
Formatdifferent
Workshop + asyncWorkshopWorkshopWorkshop
Outputdifferent
Visual Board, Status Indicators, Exception CuesKaizen Charter, Waste List, Improvement Experiments, Standard Work UpdateRanked Backlog, Cost-of-Delay AssumptionsCoD Table, Prioritization Sequence
Tagsno overlap
SignalsOperationsVisual management
LeanContinuous improvementOperations
LeanEconomicsSequencePrioritization
PrioritizationDeliveryEconomicsDecision
Add more methods