methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Value Stream Mapping workspace showing the question, observations, and next decision.
Delivery
Value Stream Mapping
Paper illustration of a four-column Kanban board with limited ongoing work, a visible blocker and a review loop.
Engineering
Kanban
Paper fishbone diagram with a measurable effect at the head and six labeled cause branches.
Operations
Fishbone Diagram
Paper illustration for 8D Problem Solving.
Operations
8D Problem Solving
Purposedifferent
When delivery work dissolves into wait times, handoffs, and hidden effort, Value Stream Mapping makes the actual flow visible. The method exposes bottlenecks, idle time, and feedback loops so lead time and improvement levers become tangible.When work sits in too many parallel streams, throughput suffers and no one sees the bottlenecks. Kanban makes the flow of work visible and limits overload so a system becomes calmer and more predictable.When a problem has several possible contributing factors, the method sorts causes by cause areas. It prevents an initial hunch from blocking the view of other plausible drivers.For an acute quality or delivery problem, the method structures immediate protection and root cause work together. It keeps the situation stable while the actual cause is investigated cleanly.
Complexitydifferent
MediumMediumLowHigh
Timedifferent
1-3 hOngoing30-60 min1-6 Wochen
Participantsdifferent
4-102-122-84-10
Formatdifferent
WorkshopWorkshop + asyncWorkshopWorkshop + async
Outputdifferent
Current-state map, Future-state map, Bottleneck listKanban board, WIP policies, Flow metricsFishbone Diagram, Cause Categories, Investigation Backlog8D Report, Containment Plan, Root Cause Evidence, Corrective Action Plan
Tagsno overlap
LeanFlowWasteDelivery
FlowVisual managementDelivery
Root causeQualityOperations
QualityProblem solvingRoot cause
Add more methods