methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Story Splitting method illustration showing its working structure
Agile
Story Splitting
Paper illustration for Bottleneck Analysis.
Operations
Bottleneck Analysis
Paper illustration for Monte Carlo Forecasting.
Delivery
Monte Carlo Forecasting
Paper illustration for Theory of Constraints.
Operations
Theory of Constraints
Purposedifferent
When a story becomes too large for a clean flow, it breaks scope down along value and risk. It shapes the work into a form that ships earlier and is easier to verify.For a flow that backs up at one point, the method looks for the capacity limit with the greatest leverage. It explains why extra effort elsewhere barely improves throughput.Helps clarify scope, sequence, and delivery flow in concrete terms. It makes work, boundaries, and order steerable. The result is captured as Forecast Percentiles, Throughput Dataset, and Risk Communication.For a system that does not get faster despite effort, the method directs attention to the bottleneck. It concentrates improvement on the point that actually limits throughput.
Complexitydifferent
MediumMediumHighHigh
Timedifferent
30-60 min1-3 h30-90 min Setup, danach laufend2-4 h Analyse, laufend
Participantsdifferent
2-63-81-83-12
Formatsame
Workshop + asyncWorkshop + asyncWorkshop + asyncWorkshop + async
Outputdifferent
Smaller Stories, Acceptance Criteria, Split RationaleBottleneck Map, Flow Metrics, Improvement Options, Follow-up MeasuresForecast Percentiles, Throughput Dataset, Risk CommunicationConstraint Map, Improvement Plan, Flow Metrics
Tagsno overlap
BacklogIterationDelivery
FlowMeasurementConstraints
ForecastingFlowDelivery
OperationsConstraintsFlowImprovement
Add more methods