View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Delivery Shape Up | ![]() Engineering Fault Isolation | ![]() Operations 8D Problem Solving | ![]() Operations 5 Whys |
|---|---|---|---|---|
Purposedifferent | Shape Up helps clarify scope, sequence, and delivery flow. It makes work boundaries and decisions explicit and captures results as pitches, bet-table decisions, and hill charts. | In technical failures, the visible symptom often gets mixed up with the actual cause. Fault Isolation narrows the fault space and progressively reduces which part of the system is truly affected. | For an acute quality or delivery problem, the method structures immediate protection and root cause work together. It keeps the situation stable while the actual cause is investigated cleanly. | For a single, hard-to-explain deviation, the method exposes the causal chain behind the visible symptom. It keeps the cause open until a controllable condition emerges instead of a mere description. |
Complexitydifferent | Medium | Medium | High | Low |
Timedifferent | 6 Wochen Cycle + 2 Wochen Cool-Down | 30-180 min | 1-6 Wochen | 15-30 min |
Participantsdifferent | 2-4 pro Pitch | 1-6 | 4-10 | 2-6 |
Formatdifferent | Workshop + async | Workshop + async | Workshop + async | Workshop |
Outputdifferent | Pitches, Bet-table decisions, Hill charts, Cooldown outcomes | Fault Isolation Map, Test Log, Excluded Hypotheses, Narrowed Fault Area | 8D Report, Containment Plan, Root Cause Evidence, Corrective Action Plan | Root cause notes, Countermeasures |
Tagsno overlap | PlanningDeliveryAutonomy | TroubleshootingDiagnosisEngineering | QualityProblem solvingRoot cause | Root causeIncidentLeanProblem solving |



