methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration of Shape Up with its method-specific working model.
Delivery
Shape Up
Paper illustration for Constraint Analysis.
Decision Making
Constraint Analysis
Paper illustration for Bottleneck Analysis.
Operations
Bottleneck Analysis
Paper illustration of a four-column Kanban board with limited ongoing work, a visible blocker and a review loop.
Engineering
Kanban
Purposedifferent
Shape Up helps clarify scope, sequence, and delivery flow. It makes work boundaries and decisions explicit and captures results as pitches, bet-table decisions, and hill charts.When an initiative stalls, the limit often lies not in the idea but in hard or soft boundary conditions. Constraint Analysis separates these limits and shows which of them can actually be shaped.For a flow that backs up at one point, the method looks for the capacity limit with the greatest leverage. It explains why extra effort elsewhere barely improves throughput.When work sits in too many parallel streams, throughput suffers and no one sees the bottlenecks. Kanban makes the flow of work visible and limits overload so a system becomes calmer and more predictable.
Complexitydifferent
MediumLowMediumMedium
Timedifferent
6 Wochen Cycle + 2 Wochen Cool-Down30-90 min1-3 hOngoing
Participantsdifferent
2-4 pro Pitch2-83-82-12
Formatsame
Workshop + asyncWorkshop + asyncWorkshop + asyncWorkshop + async
Outputdifferent
Pitches, Bet-table decisions, Hill charts, Cooldown outcomesConstraint List, Hard/Soft Classification, Option Impact Notes, Decision BoundariesBottleneck Map, Flow Metrics, Improvement Options, Follow-up MeasuresKanban board, WIP policies, Flow metrics
Tagsno overlap
PlanningDeliveryAutonomy
ConstraintsDecisionPlanningOptions
FlowMeasurementConstraints
FlowVisual managementDelivery
Add more methods