methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration of Request for Comments (RFC) with its method-specific working model.
Architecture
Request for Comments
A paper-based illustration representing WSJF with its core stages and visible working result.
Agile
WSJF
Paper illustration: scenarios and architectural decisions are connected to identified risks.
Architecture
ATAM (Architecture Tradeoff Analysis Method)
Paper illustration of a calibrated five-by-five risk matrix with response cards.
Decision Making
Risk Matrix
Purposedifferent
An RFC clarifies architecture context, options, and consequences. It structures technical context, alternatives, tradeoffs, open questions, and review feedback, and captures the result as an RFC document, reviewer comments, and a decision rationale.When many tasks compete for the same capacity, it orders work by economic impact. It makes time lost, benefit, and effort comparable together.ATAM helps teams weigh architecture decisions when quality goals compete. The team considers business goals, stakeholder expectations, and technical decisions together. The evaluation shows which risks need further investigation.When a project faces many possible disruptions, it quickly becomes unclear which risks deserve attention first. It separates options, evaluation criteria, and open risks. The result is captured as a Risk Matrix and a Top Risk List.
Complexitydifferent
MediumHighHighLow
Timedifferent
1-3 Wochen vom Draft bis zur Entscheidung45-90 minSeveral meetings plus preparation and analysis; total effort depends on scope30-60 min
Participantsdifferent
3-20 Reviewer3-10Evaluation team, architects, and relevant stakeholders3-10
Formatdifferent
AsyncWorkshopWorkshop + asyncWorkshop + async
Outputdifferent
RFC document, Reviewer comments, Decision rationale, Follow-up ADR or ticketsRanked Backlog, Cost-of-Delay AssumptionsPrioritized quality scenarios in a utility tree, Architecture risks with reasoning and assumptions, Sensitivity and trade-off points, Findings report with open investigationsRisk Matrix, Top Risk List
Tagsno overlap
ArchitectureDecisionAsyncGovernance
LeanEconomicsSequencePrioritization
ArchitectureQualityRiskTradeoffsStakeholders
RiskDecisionPrioritizationAssessment
Add more methods