methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration for NoEstimates.
Agile
NoEstimates
Software Architecture Canvas method illustration showing its working structure
Architecture
Software Architecture Canvas
Paper illustration for Monte Carlo Forecasting.
Delivery
Monte Carlo Forecasting
Paper illustration of a four-column Kanban board with limited ongoing work, a visible blocker and a review loop.
Engineering
Kanban
Purposedifferent
When estimating slows a team down more than it helps, it shifts the focus to flow, small slices, and real lead time. It sorts work by value, risk, and delivery ability. The result is captured as Throughput Data, Flow Forecast, and Slicing Rules.The Software Architecture Canvas reduces a system to the most important architecture decisions, constraints, and interfaces. It is useful when teams need a resilient overall picture quickly.Helps clarify scope, sequence, and delivery flow in concrete terms. It makes work, boundaries, and order steerable. The result is captured as Forecast Percentiles, Throughput Dataset, and Risk Communication.When work sits in too many parallel streams, throughput suffers and no one sees the bottlenecks. Kanban makes the flow of work visible and limits overload so a system becomes calmer and more predictable.
Complexitydifferent
MediumLowHighMedium
Timedifferent
laufend1-2 h30-90 min Setup, danach laufendOngoing
Participantsdifferent
2-123-101-82-12
Formatdifferent
Workshop + asyncWorkshopWorkshop + asyncWorkshop + async
Outputdifferent
Throughput Data, Flow Forecast, Slicing RulesArchitecture Canvas, Goals, Constraints, Quality AttributesForecast Percentiles, Throughput Dataset, Risk CommunicationKanban board, WIP policies, Flow metrics
Tagsno overlap
EstimationForecastingFlow
CanvasArchitectureAlignmentWorkshop
ForecastingFlowDelivery
FlowVisual managementDelivery
Add more methods