View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Agile NoEstimates | ![]() Operations 8D Problem Solving | ![]() Operations Bottleneck Analysis | ![]() Operations 5 Whys |
|---|---|---|---|---|
Purposedifferent | When estimating slows a team down more than it helps, it shifts the focus to flow, small slices, and real lead time. It sorts work by value, risk, and delivery ability. The result is captured as Throughput Data, Flow Forecast, and Slicing Rules. | For an acute quality or delivery problem, the method structures immediate protection and root cause work together. It keeps the situation stable while the actual cause is investigated cleanly. | For a flow that backs up at one point, the method looks for the capacity limit with the greatest leverage. It explains why extra effort elsewhere barely improves throughput. | For a single, hard-to-explain deviation, the method exposes the causal chain behind the visible symptom. It keeps the cause open until a controllable condition emerges instead of a mere description. |
Complexitydifferent | Medium | High | Medium | Low |
Timedifferent | laufend | 1-6 Wochen | 1-3 h | 15-30 min |
Participantsdifferent | 2-12 | 4-10 | 3-8 | 2-6 |
Formatdifferent | Workshop + async | Workshop + async | Workshop + async | Workshop |
Outputdifferent | Throughput Data, Flow Forecast, Slicing Rules | 8D Report, Containment Plan, Root Cause Evidence, Corrective Action Plan | Bottleneck Map, Flow Metrics, Improvement Options, Follow-up Measures | Root cause notes, Countermeasures |
Tagsno overlap | EstimationForecastingFlow | QualityProblem solvingRoot cause | FlowMeasurementConstraints | Root causeIncidentLeanProblem solving |



