methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration for Monte Carlo Forecasting.
Delivery
Monte Carlo Forecasting
Paper illustration for Trade-off Analysis.
Decision Making
Trade-off Analysis
Paper illustration for Bottleneck Analysis.
Operations
Bottleneck Analysis
Paper illustration of Cost of Delay with its method-specific working model.
Delivery
Cost of Delay
Purposedifferent
Helps clarify scope, sequence, and delivery flow in concrete terms. It makes work, boundaries, and order steerable. The result is captured as Forecast Percentiles, Throughput Dataset, and Risk Communication.With limited resources, quality, speed, cost, and risk almost always compete with each other. Trade-off Analysis makes these tensions explicit and prevents decisions from producing hidden side effects.For a flow that backs up at one point, the method looks for the capacity limit with the greatest leverage. It explains why extra effort elsewhere barely improves throughput.Helps clarify scope, order, and delivery flow in concrete terms. It makes work, constraints, and sequence manageable. The result is captured as a Cost of Delay table and prioritization sequence.
Complexitydifferent
HighMediumMediumHigh
Timedifferent
30-90 min Setup, danach laufend45-120 min1-3 h90-180 min
Participantsdifferent
1-82-83-83-8
Formatdifferent
Workshop + asyncWorkshop + asyncWorkshop + asyncWorkshop
Outputdifferent
Forecast Percentiles, Throughput Dataset, Risk CommunicationTrade-off Matrix, Criteria List, Decision Rationale, Accepted DownsidesBottleneck Map, Flow Metrics, Improvement Options, Follow-up MeasuresCoD Table, Prioritization Sequence
Tagsno overlap
ForecastingFlowDelivery
TradeoffsDecisionCriteriaOptions
FlowMeasurementConstraints
PrioritizationDeliveryEconomicsDecision
Add more methods