methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration of a four-column Kanban board with limited ongoing work, a visible blocker and a review loop.
Engineering
Kanban
A paper-based illustration representing WSJF with its core stages and visible working result.
Agile
WSJF
Paper illustration for Monte Carlo Forecasting.
Delivery
Monte Carlo Forecasting
A 5 Whys working surface connects an observable problem with evidenced causes, marked uncertainty and concrete countermeasures with ownership.
Operations
5 Whys
Purposedifferent
When work sits in too many parallel streams, throughput suffers and no one sees the bottlenecks. Kanban makes the flow of work visible and limits overload so a system becomes calmer and more predictable.When many tasks compete for the same capacity, it orders work by economic impact. It makes time lost, benefit, and effort comparable together.Helps clarify scope, sequence, and delivery flow in concrete terms. It makes work, boundaries, and order steerable. The result is captured as Forecast Percentiles, Throughput Dataset, and Risk Communication.For a single, hard-to-explain deviation, the method exposes the causal chain behind the visible symptom. It keeps the cause open until a controllable condition emerges instead of a mere description.
Complexitydifferent
MediumHighHighLow
Timedifferent
Ongoing45-90 min30-90 min Setup, danach laufend15-30 min
Participantsdifferent
2-123-101-82-6
Formatdifferent
Workshop + asyncWorkshopWorkshop + asyncWorkshop
Outputdifferent
Kanban board, WIP policies, Flow metricsRanked Backlog, Cost-of-Delay AssumptionsForecast Percentiles, Throughput Dataset, Risk CommunicationRoot cause notes, Countermeasures
Tagsno overlap
FlowVisual managementDelivery
LeanEconomicsSequencePrioritization
ForecastingFlowDelivery
Root causeIncidentLeanProblem solving
Add more methods