View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Engineering Kanban | ![]() Agile WSJF | ![]() Operations 5 Whys | ![]() Operations 8D Problem Solving |
|---|---|---|---|---|
Purposedifferent | When work sits in too many parallel streams, throughput suffers and no one sees the bottlenecks. Kanban makes the flow of work visible and limits overload so a system becomes calmer and more predictable. | When many tasks compete for the same capacity, it orders work by economic impact. It makes time lost, benefit, and effort comparable together. | For a single, hard-to-explain deviation, the method exposes the causal chain behind the visible symptom. It keeps the cause open until a controllable condition emerges instead of a mere description. | For an acute quality or delivery problem, the method structures immediate protection and root cause work together. It keeps the situation stable while the actual cause is investigated cleanly. |
Complexitydifferent | Medium | High | Low | High |
Timedifferent | Ongoing | 45-90 min | 15-30 min | 1-6 Wochen |
Participantsdifferent | 2-12 | 3-10 | 2-6 | 4-10 |
Formatdifferent | Workshop + async | Workshop | Workshop | Workshop + async |
Outputdifferent | Kanban board, WIP policies, Flow metrics | Ranked Backlog, Cost-of-Delay Assumptions | Root cause notes, Countermeasures | 8D Report, Containment Plan, Root Cause Evidence, Corrective Action Plan |
Tagsno overlap | FlowVisual managementDelivery | LeanEconomicsSequencePrioritization | Root causeIncidentLeanProblem solving | QualityProblem solvingRoot cause |



