methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration of a four-column Kanban board with limited ongoing work, a visible blocker and a review loop.
Engineering
Kanban
Paper illustration for Three-Point Estimation.
Decision Making
Three-Point Estimation
Paper illustration for Dot Estimation.
Facilitation
Dot Estimation
Paper illustration for Monte Carlo Forecasting.
Delivery
Monte Carlo Forecasting
Purposedifferent
When work sits in too many parallel streams, throughput suffers and no one sees the bottlenecks. Kanban makes the flow of work visible and limits overload so a system becomes calmer and more predictable.A single estimate for effort, time, or risk often looks too smooth for the real uncertainty behind it. It separates options, evaluation criteria, and open risks. The result is captured as a Three-Point Estimate, Risk Range, and Assumption Notes.When size or effort can only be estimated roughly, Dot Estimation condenses the group's experience into a quick range. It turns individual contributions into a visible selection. The result is captured as an Effort Heatmap, Risk Signals, and Discussion Targets.Helps clarify scope, sequence, and delivery flow in concrete terms. It makes work, boundaries, and order steerable. The result is captured as Forecast Percentiles, Throughput Dataset, and Risk Communication.
Complexitydifferent
MediumMediumLowHigh
Timedifferent
Ongoing10-30 min je Item5-20 min30-90 min Setup, danach laufend
Participantsdifferent
2-121-83-201-8
Formatdifferent
Workshop + asyncWorkshop + asyncWorkshopWorkshop + async
Outputdifferent
Kanban board, WIP policies, Flow metricsThree-Point Estimate, Risk Range, Assumption NotesEffort Heatmap, Risk Signals, Discussion TargetsForecast Percentiles, Throughput Dataset, Risk Communication
Tagsno overlap
FlowVisual managementDelivery
EstimationUncertaintyForecasting
EstimationEffortRisk
ForecastingFlowDelivery
Add more methods