View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Engineering Kanban | ![]() Operations Bottleneck Analysis | ![]() Operations Theory of Constraints | ![]() Delivery Monte Carlo Forecasting |
|---|---|---|---|---|
Purposedifferent | When work sits in too many parallel streams, throughput suffers and no one sees the bottlenecks. Kanban makes the flow of work visible and limits overload so a system becomes calmer and more predictable. | For a flow that backs up at one point, the method looks for the capacity limit with the greatest leverage. It explains why extra effort elsewhere barely improves throughput. | For a system that does not get faster despite effort, the method directs attention to the bottleneck. It concentrates improvement on the point that actually limits throughput. | Helps clarify scope, sequence, and delivery flow in concrete terms. It makes work, boundaries, and order steerable. The result is captured as Forecast Percentiles, Throughput Dataset, and Risk Communication. |
Complexitydifferent | Medium | Medium | High | High |
Timedifferent | Ongoing | 1-3 h | 2-4 h Analyse, laufend | 30-90 min Setup, danach laufend |
Participantsdifferent | 2-12 | 3-8 | 3-12 | 1-8 |
Formatsame | Workshop + async | Workshop + async | Workshop + async | Workshop + async |
Outputdifferent | Kanban board, WIP policies, Flow metrics | Bottleneck Map, Flow Metrics, Improvement Options, Follow-up Measures | Constraint Map, Improvement Plan, Flow Metrics | Forecast Percentiles, Throughput Dataset, Risk Communication |
Tags1 shared | FlowVisual managementDelivery | FlowMeasurementConstraints | OperationsConstraintsFlowImprovement | ForecastingFlowDelivery |



