View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration of a four-column Kanban board with limited ongoing work, a visible blocker and a review loop.
Engineering
Kanban
Paper illustration for Bottleneck Analysis.
Operations
Bottleneck Analysis
Paper illustration of HEART Framework with its method-specific working model.
UX Research
HEART Framework
Paper illustration for Monte Carlo Forecasting.
Delivery
Monte Carlo Forecasting
Purposedifferent
When work sits in too many parallel streams, throughput suffers and no one sees the bottlenecks. Kanban makes the flow of work visible and limits overload so a system becomes calmer and more predictable.For a flow that backs up at one point, the method looks for the capacity limit with the greatest leverage. It explains why extra effort elsewhere barely improves throughput.Helps clarify observations, needs, and patterns in concrete terms. It groups observations into patterns, questions, and decisions. The result is captured as a HEART-GSM table and dashboard.Helps clarify scope, sequence, and delivery flow in concrete terms. It makes work, boundaries, and order steerable. The result is captured as Forecast Percentiles, Throughput Dataset, and Risk Communication.
Complexitydifferent
MediumMediumMediumHigh
Timedifferent
Ongoing1-3 h120 min initial, dann laufend30-90 min Setup, danach laufend
Participantsdifferent
2-123-83-61-8
Formatsame
Workshop + asyncWorkshop + asyncWorkshop + asyncWorkshop + async
Outputdifferent
Kanban board, WIP policies, Flow metricsBottleneck Map, Flow Metrics, Improvement Options, Follow-up MeasuresHEART-GSM Table, DashboardForecast Percentiles, Throughput Dataset, Risk Communication
Tagsno overlap
FlowVisual managementDelivery
FlowMeasurementConstraints
MetricsUX researchMeasurementSatisfaction
ForecastingFlowDelivery
Add more methods