methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper fishbone diagram with a measurable effect at the head and six labeled cause branches.
Operations
Fishbone Diagram
Paper illustration of a four-column Kanban board with limited ongoing work, a visible blocker and a review loop.
Engineering
Kanban
Paper illustration for NoEstimates.
Agile
NoEstimates
Paper illustration for 8D Problem Solving.
Operations
8D Problem Solving
Purposedifferent
When a problem has several possible contributing factors, the method sorts causes by cause areas. It prevents an initial hunch from blocking the view of other plausible drivers.When work sits in too many parallel streams, throughput suffers and no one sees the bottlenecks. Kanban makes the flow of work visible and limits overload so a system becomes calmer and more predictable.When estimating slows a team down more than it helps, it shifts the focus to flow, small slices, and real lead time. It sorts work by value, risk, and delivery ability. The result is captured as Throughput Data, Flow Forecast, and Slicing Rules.For an acute quality or delivery problem, the method structures immediate protection and root cause work together. It keeps the situation stable while the actual cause is investigated cleanly.
Complexitydifferent
LowMediumMediumHigh
Timedifferent
30-60 minOngoinglaufend1-6 Wochen
Participantsdifferent
2-82-122-124-10
Formatdifferent
WorkshopWorkshop + asyncWorkshop + asyncWorkshop + async
Outputdifferent
Fishbone Diagram, Cause Categories, Investigation BacklogKanban board, WIP policies, Flow metricsThroughput Data, Flow Forecast, Slicing Rules8D Report, Containment Plan, Root Cause Evidence, Corrective Action Plan
Tagsno overlap
Root causeQualityOperations
FlowVisual managementDelivery
EstimationForecastingFlow
QualityProblem solvingRoot cause
Add more methods