View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Operations Fishbone Diagram | ![]() Operations Failure Mode and Effects Analysis | ![]() Innovation Brainstorming | ![]() Innovation Design Charrette |
|---|---|---|---|---|
Purposedifferent | When a problem has several possible contributing factors, the method sorts causes by cause areas. It prevents an initial hunch from blocking the view of other plausible drivers. | For a process, product, or service with noticeable failure risks, the method assesses possible failure modes in advance. It directs attention to combinations of occurrence, effect, and detectability. | When a team faces an open question with many obvious directions, the method first creates breadth instead of premature commitment. It separates idea flow from evaluation and makes lines of thought visible, creating a pool for selection and further development. | In a tightly timed design process with many participants, the method pools several lines of thinking in a short time. It brings parallel design energy without letting the discussion tip into endless coordination. This quickly produces solid directions for architecture or space. |
Complexitydifferent | Low | High | Low | Medium |
Timedifferent | 30-60 min | 2-6 h | 30-60 min | Halber Tag bis mehrere Tage |
Participantsdifferent | 2-8 | 3-10 | 4-12 | 10-50 |
Formatsame | Workshop | Workshop | Workshop | Workshop |
Outputdifferent | Fishbone Diagram, Cause Categories, Investigation Backlog | FMEA Table, Risk Priority, Mitigation Actions | Idea pool, Theme clusters, Shortlist | Sketches and Concepts, Consolidated Solution Sketch, Prioritized Direction |
Tagsno overlap | Root causeQualityOperations | RiskQualityOperationsRoot cause | BrainstormingIdeationCreativityWorkshopDivergence | BrainstormingWorkshopCollaborationIdeation |



