methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration for Failure Scenario Analysis.
Engineering
Failure Scenario Analysis
Paper illustration for TRIZ
Innovation
TRIZ
A hypothetical failure makes concrete risks, signals, and fitting mitigations visible.
Decision Making
Pre-Mortem
Paper illustration of the Lightning Decision Jam working structure.
Facilitation
Decision Jam
Purposedifferent
In critical processes, it is not enough to plan only for the normal case. Failure Scenario Analysis looks at the path into failure and shows which failures, chains, and control gaps cause the most damage.For technical contradictions or trade-offs, the method looks for solutions that resolve opposing requirements at the same time. It translates limits into an explicit picture of conflict that becomes workable. This produces not just compromises but more elegant principles.In early initiatives with many uncertainties, planning quickly turns too optimistic. A pre-mortem makes the expected failure visible in advance and sharpens the view of causes, gaps, and countermeasures.When a decision is stuck, Decision Jam loosens the knot through structured separation of problem, idea, and selection. The format creates movement without jumping prematurely at the first seemingly elegant answer.
Complexitydifferent
MediumHighLowLow
Timedifferent
1-3 h1-4 h20–45 min60-90 min
Participantsdifferent
3-82-8Small cross-functional group4-10
Formatdifferent
WorkshopWorkshop + asyncWorkshopWorkshop
Outputdifferent
Failure Scenarios, Risk Notes, Control Gaps, Test and Response ActionsContradiction Statement, Inventive Principles, Solution ConceptsRisk list, Mitigation plan, Assumption logProblem Cluster, Prioritized Challenge, Experiment
Tagsno overlap
FailureResilienceRisk
InnovationProblem solvingContradictionsCreativity
RiskDecisionFailurePlanning
FacilitationDecisionProblem solvingWorkshop
Add more methods