View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Engineering Failure Scenario Analysis | ![]() Decision Making Three-Point Estimation | ![]() Decision Making Wideband Delphi | ![]() Facilitation Dot Estimation |
|---|---|---|---|---|
Purposedifferent | In critical processes, it is not enough to plan only for the normal case. Failure Scenario Analysis looks at the path into failure and shows which failures, chains, and control gaps cause the most damage. | A single estimate for effort, time, or risk often looks too smooth for the real uncertainty behind it. It separates options, evaluation criteria, and open risks. The result is captured as a Three-Point Estimate, Risk Range, and Assumption Notes. | A single opinion rarely holds up for planning when the future is genuinely uncertain. It separates options, evaluation criteria, and open risks. The result is captured as an Estimate Range, Assumption Log, and Expert Consensus Notes. | When size or effort can only be estimated roughly, Dot Estimation condenses the group's experience into a quick range. It turns individual contributions into a visible selection. The result is captured as an Effort Heatmap, Risk Signals, and Discussion Targets. |
Complexitydifferent | Medium | Medium | High | Low |
Timedifferent | 1-3 h | 10-30 min je Item | 1-4 h or multiple rounds | 5-20 min |
Participantsdifferent | 3-8 | 1-8 | 4-12 Experten | 3-20 |
Formatdifferent | Workshop | Workshop + async | Workshop + async | Workshop |
Outputdifferent | Failure Scenarios, Risk Notes, Control Gaps, Test and Response Actions | Three-Point Estimate, Risk Range, Assumption Notes | Estimate Range, Assumption Log, Expert Consensus Notes | Effort Heatmap, Risk Signals, Discussion Targets |
Tagsno overlap | FailureResilienceRisk | EstimationUncertaintyForecasting | EstimationExpertsForecasting | EstimationEffortRisk |



