View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Engineering Failure Scenario Analysis | ![]() Decision Making Three-Point Estimation | ![]() Engineering Kanban | ![]() Facilitation Dot Estimation |
|---|---|---|---|---|
Purposedifferent | In critical processes, it is not enough to plan only for the normal case. Failure Scenario Analysis looks at the path into failure and shows which failures, chains, and control gaps cause the most damage. | A single estimate for effort, time, or risk often looks too smooth for the real uncertainty behind it. It separates options, evaluation criteria, and open risks. The result is captured as a Three-Point Estimate, Risk Range, and Assumption Notes. | When work sits in too many parallel streams, throughput suffers and no one sees the bottlenecks. Kanban makes the flow of work visible and limits overload so a system becomes calmer and more predictable. | When size or effort can only be estimated roughly, Dot Estimation condenses the group's experience into a quick range. It turns individual contributions into a visible selection. The result is captured as an Effort Heatmap, Risk Signals, and Discussion Targets. |
Complexitydifferent | Medium | Medium | Medium | Low |
Timedifferent | 1-3 h | 10-30 min je Item | Ongoing | 5-20 min |
Participantsdifferent | 3-8 | 1-8 | 2-12 | 3-20 |
Formatdifferent | Workshop | Workshop + async | Workshop + async | Workshop |
Outputdifferent | Failure Scenarios, Risk Notes, Control Gaps, Test and Response Actions | Three-Point Estimate, Risk Range, Assumption Notes | Kanban board, WIP policies, Flow metrics | Effort Heatmap, Risk Signals, Discussion Targets |
Tagsno overlap | FailureResilienceRisk | EstimationUncertaintyForecasting | FlowVisual managementDelivery | EstimationEffortRisk |