View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Engineering Failure Scenario Analysis | ![]() Decision Making Pre-Mortem | ![]() Operations 8D Problem Solving | ![]() Operations Failure Mode and Effects Analysis |
|---|---|---|---|---|
Purposedifferent | In critical processes, it is not enough to plan only for the normal case. Failure Scenario Analysis looks at the path into failure and shows which failures, chains, and control gaps cause the most damage. | In early initiatives with many uncertainties, planning quickly turns too optimistic. A pre-mortem makes the expected failure visible in advance and sharpens the view of causes, gaps, and countermeasures. | For an acute quality or delivery problem, the method structures immediate protection and root cause work together. It keeps the situation stable while the actual cause is investigated cleanly. | For a process, product, or service with noticeable failure risks, the method assesses possible failure modes in advance. It directs attention to combinations of occurrence, effect, and detectability. |
Complexitydifferent | Medium | Low | High | High |
Timedifferent | 1-3 h | 20–45 min | 1-6 Wochen | 2-6 h |
Participantsdifferent | 3-8 | Small cross-functional group | 4-10 | 3-10 |
Formatdifferent | Workshop | Workshop | Workshop + async | Workshop |
Outputdifferent | Failure Scenarios, Risk Notes, Control Gaps, Test and Response Actions | Risk list, Mitigation plan, Assumption log | 8D Report, Containment Plan, Root Cause Evidence, Corrective Action Plan | FMEA Table, Risk Priority, Mitigation Actions |
Tagsno overlap | FailureResilienceRisk | RiskDecisionFailurePlanning | QualityProblem solvingRoot cause | RiskQualityOperationsRoot cause |



