View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Engineering Failure Scenario Analysis | ![]() Facilitation Dot Estimation | ![]() Product Discovery Assumption Mapping | ![]() Product Discovery Experiment Canvas |
|---|---|---|---|---|
Purposedifferent | In critical processes, it is not enough to plan only for the normal case. Failure Scenario Analysis looks at the path into failure and shows which failures, chains, and control gaps cause the most damage. | When size or effort can only be estimated roughly, Dot Estimation condenses the group's experience into a quick range. It turns individual contributions into a visible selection. The result is captured as an Effort Heatmap, Risk Signals, and Discussion Targets. | When assumptions still sit unordered in the room, it weighs uncertainty against leverage. It makes visible which hypotheses should be checked first. | When experiments become unreadable after the fact, it arranges hypothesis, signal, and learning goal on a single canvas. It separates problem, assumption, solution, and evidence. The result is captured as a Completed Experiment Canvas and a Success Metric. |
Complexitydifferent | Medium | Low | Medium | Low |
Timedifferent | 1-3 h | 5-20 min | 45-60 min | 30-60 min |
Participantsdifferent | 3-8 | 3-20 | 2-8 | 1-5 |
Formatdifferent | Workshop | Workshop | Workshop + async | Workshop + async |
Outputdifferent | Failure Scenarios, Risk Notes, Control Gaps, Test and Response Actions | Effort Heatmap, Risk Signals, Discussion Targets | Assumption map, Test backlog, Risk ranking | Completed Experiment Canvas, Success Metric |
Tagsno overlap | FailureResilienceRisk | EstimationEffortRisk | AssumptionsRiskExperimentsValidation | ExperimentsValidationDiscoveryHypothesis |



