methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration for Dot Estimation.
Facilitation
Dot Estimation
Paper illustration of a four-column Kanban board with limited ongoing work, a visible blocker and a review loop.
Engineering
Kanban
Paper illustration for Root Cause Tree Analysis
Operations
Root Cause Tree Analysis
Paper illustration for 8D Problem Solving.
Operations
8D Problem Solving
Purposedifferent
When size or effort can only be estimated roughly, Dot Estimation condenses the group's experience into a quick range. It turns individual contributions into a visible selection. The result is captured as an Effort Heatmap, Risk Signals, and Discussion Targets.When work sits in too many parallel streams, throughput suffers and no one sees the bottlenecks. Kanban makes the flow of work visible and limits overload so a system becomes calmer and more predictable.For a problem with several suspected causes, the method builds a causal structure instead of a mere list. It makes visible how causes connect and where the strongest points of leverage lie.For an acute quality or delivery problem, the method structures immediate protection and root cause work together. It keeps the situation stable while the actual cause is investigated cleanly.
Complexitydifferent
LowMediumMediumHigh
Timedifferent
5-20 minOngoing1-3 h1-6 Wochen
Participantsdifferent
3-202-122-84-10
Formatdifferent
WorkshopWorkshop + asyncWorkshopWorkshop + async
Outputdifferent
Effort Heatmap, Risk Signals, Discussion TargetsKanban board, WIP policies, Flow metricsCause Tree, Evidence Notes, Countermeasures8D Report, Containment Plan, Root Cause Evidence, Corrective Action Plan
Tagsno overlap
EstimationEffortRisk
FlowVisual managementDelivery
Root causeTreeIncidentQuality
QualityProblem solvingRoot cause
Add more methods