Criterion
Paper illustration for Dot Estimation.
Facilitation
Dot Estimation
Paper illustration of Hooked Model with its method-specific working model.
Growth
Hooked Model
Paper illustration for Monte Carlo Forecasting.
Delivery
Monte Carlo Forecasting
Paper illustration of a four-column Kanban board with limited ongoing work, a visible blocker and a review loop.
Engineering
Kanban
Purposedifferent
When size or effort can only be estimated roughly, Dot Estimation condenses the group's experience into a quick range. It turns individual contributions into a visible selection. The result is captured as an Effort Heatmap, Risk Signals, and Discussion Targets.The Hooked Model helps clarify engagement loops, user behavior, and experiments. It makes repeat behavior measurable and captures the result as a hooked loop, trigger map, and reward design.Helps clarify scope, sequence, and delivery flow in concrete terms. It makes work, boundaries, and order steerable. The result is captured as Forecast Percentiles, Throughput Dataset, and Risk Communication.When work sits in too many parallel streams, throughput suffers and no one sees the bottlenecks. Kanban makes the flow of work visible and limits overload so a system becomes calmer and more predictable.
Complexitydifferent
LowMediumHighMedium
Timedifferent
5-20 minMultiple workshops over several weeks30-90 min Setup, danach laufendOngoing
Participantsdifferent
3-202-81-82-12
Formatdifferent
WorkshopWorkshop + asyncWorkshop + asyncWorkshop + async
Outputdifferent
Effort Heatmap, Risk Signals, Discussion TargetsHooked loop, Trigger map, Reward design, Ethics checkForecast Percentiles, Throughput Dataset, Risk CommunicationKanban board, WIP policies, Flow metrics
Tagsno overlap
EstimationEffortRisk
GrowthBehaviorRetention
ForecastingFlowDelivery
FlowVisual managementDelivery