View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Facilitation Dot Estimation | ![]() Operations Fault Tree Analysis | ![]() Operations 8D Problem Solving | ![]() Operations 5 Whys |
|---|---|---|---|---|
Purposedifferent | When size or effort can only be estimated roughly, Dot Estimation condenses the group's experience into a quick range. It turns individual contributions into a visible selection. The result is captured as an Effort Heatmap, Risk Signals, and Discussion Targets. | For a critical top event with several possible triggers, the method logically models failure paths. It makes visible which combinations of conditions can lead to damage. | For an acute quality or delivery problem, the method structures immediate protection and root cause work together. It keeps the situation stable while the actual cause is investigated cleanly. | For a single, hard-to-explain deviation, the method exposes the causal chain behind the visible symptom. It keeps the cause open until a controllable condition emerges instead of a mere description. |
Complexitydifferent | Low | High | High | Low |
Timedifferent | 5-20 min | 2-6 h | 1-6 Wochen | 15-30 min |
Participantsdifferent | 3-20 | 3-8 | 4-10 | 2-6 |
Formatdifferent | Workshop | Workshop + async | Workshop + async | Workshop |
Outputdifferent | Effort Heatmap, Risk Signals, Discussion Targets | Fault Tree, Critical Paths, Cause Hypotheses, Control Actions | 8D Report, Containment Plan, Root Cause Evidence, Corrective Action Plan | Root cause notes, Countermeasures |
Tagsno overlap | EstimationEffortRisk | RiskRoot causeSafety | QualityProblem solvingRoot cause | Root causeIncidentLeanProblem solving |



