View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Facilitation Dot Estimation | ![]() Engineering Failure Scenario Analysis | ![]() Product Discovery Riskiest Assumption Test | ![]() Product Discovery Assumption Mapping |
|---|---|---|---|---|
Purposedifferent | When size or effort can only be estimated roughly, Dot Estimation condenses the group's experience into a quick range. It turns individual contributions into a visible selection. The result is captured as an Effort Heatmap, Risk Signals, and Discussion Targets. | In critical processes, it is not enough to plan only for the normal case. Failure Scenario Analysis looks at the path into failure and shows which failures, chains, and control gaps cause the most damage. | When an idea hinges on one critical unknown, it prioritizes testing that exact piece of uncertainty first. It separates problem, assumption, solution, and evidence. The result is captured as a prioritized list of assumptions, a test plan, and a result report. | When assumptions still sit unordered in the room, it weighs uncertainty against leverage. It makes visible which hypotheses should be checked first. |
Complexitydifferent | Low | Medium | Medium | Medium |
Timedifferent | 5-20 min | 1-3 h | 1-2 Wochen pro Iteration | 45-60 min |
Participantsdifferent | 3-20 | 3-8 | 2-6 | 2-8 |
Formatdifferent | Workshop | Workshop | Workshop + async | Workshop + async |
Outputdifferent | Effort Heatmap, Risk Signals, Discussion Targets | Failure Scenarios, Risk Notes, Control Gaps, Test and Response Actions | Prioritized Assumption List, Test Plan, Results Report | Assumption map, Test backlog, Risk ranking |
Tagsno overlap | EstimationEffortRisk | FailureResilienceRisk | ExperimentsValidationDiscoveryAssumptions | AssumptionsRiskExperimentsValidation |



