View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Facilitation Dot Estimation | ![]() Engineering Failure Scenario Analysis | ![]() Product Discovery MVP Test Matrix | ![]() Product Discovery Assumption Mapping |
|---|---|---|---|---|
Purposedifferent | When size or effort can only be estimated roughly, Dot Estimation condenses the group's experience into a quick range. It turns individual contributions into a visible selection. The result is captured as an Effort Heatmap, Risk Signals, and Discussion Targets. | In critical processes, it is not enough to plan only for the normal case. Failure Scenario Analysis looks at the path into failure and shows which failures, chains, and control gaps cause the most damage. | When several minimal variants compete to answer the same question, it makes comparing and choosing between them cleaner. It separates problem, assumption, solution, and evidence. The result is captured as a Test Matrix and a Test Plan. | When assumptions still sit unordered in the room, it weighs uncertainty against leverage. It makes visible which hypotheses should be checked first. |
Complexitydifferent | Low | Medium | Medium | Medium |
Timedifferent | 5-20 min | 1-3 h | 45-75 min | 45-60 min |
Participantsdifferent | 3-20 | 3-8 | 2-8 | 2-8 |
Formatdifferent | Workshop | Workshop | Workshop | Workshop + async |
Outputdifferent | Effort Heatmap, Risk Signals, Discussion Targets | Failure Scenarios, Risk Notes, Control Gaps, Test and Response Actions | Test Matrix, Test Plan | Assumption map, Test backlog, Risk ranking |
Tagsno overlap | EstimationEffortRisk | FailureResilienceRisk | ExperimentsValidationDiscoveryOptions | AssumptionsRiskExperimentsValidation |