View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Facilitation Dot Estimation | ![]() Decision Making Constraint Analysis | ![]() Engineering Failure Scenario Analysis | ![]() Decision Making Pre-Mortem |
|---|---|---|---|---|
Purposedifferent | When size or effort can only be estimated roughly, Dot Estimation condenses the group's experience into a quick range. It turns individual contributions into a visible selection. The result is captured as an Effort Heatmap, Risk Signals, and Discussion Targets. | When an initiative stalls, the limit often lies not in the idea but in hard or soft boundary conditions. Constraint Analysis separates these limits and shows which of them can actually be shaped. | In critical processes, it is not enough to plan only for the normal case. Failure Scenario Analysis looks at the path into failure and shows which failures, chains, and control gaps cause the most damage. | In early initiatives with many uncertainties, planning quickly turns too optimistic. A pre-mortem makes the expected failure visible in advance and sharpens the view of causes, gaps, and countermeasures. |
Complexitydifferent | Low | Low | Medium | Low |
Timedifferent | 5-20 min | 30-90 min | 1-3 h | 20–45 min |
Participantsdifferent | 3-20 | 2-8 | 3-8 | Small cross-functional group |
Formatdifferent | Workshop | Workshop + async | Workshop | Workshop |
Outputdifferent | Effort Heatmap, Risk Signals, Discussion Targets | Constraint List, Hard/Soft Classification, Option Impact Notes, Decision Boundaries | Failure Scenarios, Risk Notes, Control Gaps, Test and Response Actions | Risk list, Mitigation plan, Assumption log |
Tagsno overlap | EstimationEffortRisk | ConstraintsDecisionPlanningOptions | FailureResilienceRisk | RiskDecisionFailurePlanning |



