View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Operations DMAIC | ![]() Facilitation Dot Estimation | ![]() Operations Fishbone Diagram | ![]() Operations Fault Tree Analysis |
|---|---|---|---|---|
Purposedifferent | For a process problem with fluctuating performance, the method brings analysis and improvement into a disciplined sequence. It creates a framework in which numbers, causes, and control come together. | When size or effort can only be estimated roughly, Dot Estimation condenses the group's experience into a quick range. It turns individual contributions into a visible selection. The result is captured as an Effort Heatmap, Risk Signals, and Discussion Targets. | When a problem has several possible contributing factors, the method sorts causes by cause areas. It prevents an initial hunch from blocking the view of other plausible drivers. | For a critical top event with several possible triggers, the method logically models failure paths. It makes visible which combinations of conditions can lead to damage. |
Complexitydifferent | High | Low | Low | High |
Timedifferent | 2-12 Wochen | 5-20 min | 30-60 min | 2-6 h |
Participantsdifferent | 3-10 | 3-20 | 2-8 | 3-8 |
Formatdifferent | Workshop + async | Workshop | Workshop | Workshop + async |
Outputdifferent | Project Charter, Measurement Plan, Cause Analysis, Control Plan | Effort Heatmap, Risk Signals, Discussion Targets | Fishbone Diagram, Cause Categories, Investigation Backlog | Fault Tree, Critical Paths, Cause Hypotheses, Control Actions |
Tagsno overlap | Continuous improvementQualityProcess improvement | EstimationEffortRisk | Root causeQualityOperations | RiskRoot causeSafety |



