Criterion
Paper illustration of Cost of Delay with its method-specific working model.
Delivery
Cost of Delay
A paper-based illustration representing WSJF with its core stages and visible working result.
Agile
WSJF
Paper illustration of Request for Comments (RFC) with its method-specific working model.
Architecture
Request for Comments
Paper illustration of two considered options leading to a decision record with a marked status and visible consequences.
Architecture
Architecture Decision Record
Purposedifferent
Helps clarify scope, order, and delivery flow in concrete terms. It makes work, constraints, and sequence manageable. The result is captured as a Cost of Delay table and prioritization sequence.When many tasks compete for the same capacity, it orders work by economic impact. It makes time lost, benefit, and effort comparable together.An RFC clarifies architecture context, options, and consequences. It structures technical context, alternatives, tradeoffs, open questions, and review feedback, and captures the result as an RFC document, reviewer comments, and a decision rationale.An ADR permanently records an architecture decision with context, trade-offs, and consequence. It creates continuity for later changes because the decision path stays traceable.
Complexitydifferent
HighHighMediumLow
Timedifferent
90-180 min45-90 min1-3 Wochen vom Draft bis zur Entscheidung15-45 min
Participantsdifferent
3-83-103-20 Reviewer1-3
Formatdifferent
WorkshopWorkshopAsyncAsync
Outputdifferent
CoD Table, Prioritization SequenceRanked Backlog, Cost-of-Delay AssumptionsRFC document, Reviewer comments, Decision rationale, Follow-up ADR or ticketsADR File, Decision Log, Rationale
Tagsno overlap
PrioritizationDeliveryEconomicsDecision
LeanEconomicsSequencePrioritization
ArchitectureDecisionAsyncGovernance
ArchitectureRationaleDocumentationGovernance