methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration for Bottleneck Analysis.
Operations
Bottleneck Analysis
Paper illustration for Time Blocking
Operations
Time Blocking
Paper objective sheet with five SMART fields, baseline, target, owner, deadline and a complete result statement.
Product Strategy
SMART Goals
Paper illustration for Constraint Analysis.
Decision Making
Constraint Analysis
Purposedifferent
For a flow that backs up at one point, the method looks for the capacity limit with the greatest leverage. It explains why extra effort elsewhere barely improves throughput.With a calendar that grows on request, the method makes available time explicit again. It combines appointments, focus work, and buffer into a more realistic day structure.When goals are formulated too generally, it brings measurability, direction, and timing into shape. It prevents intentions from staying without clear verification.When an initiative stalls, the limit often lies not in the idea but in hard or soft boundary conditions. Constraint Analysis separates these limits and shows which of them can actually be shaped.
Complexitydifferent
MediumLowLowLow
Timedifferent
1-3 h15-30 min Planung, laufend15-30 min30-90 min
Participantsdifferent
3-811-82-8
Formatdifferent
Workshop + asyncAsyncWorkshop + asyncWorkshop + async
Outputdifferent
Bottleneck Map, Flow Metrics, Improvement Options, Follow-up MeasuresBlocked Calendar, Capacity View, Focus PlanSMART Goal, Measurement Note, DeadlineConstraint List, Hard/Soft Classification, Option Impact Notes, Decision Boundaries
Tagsno overlap
FlowMeasurementConstraints
PlanningTime managementFocus
GoalsPlanningMeasurementAlignment
ConstraintsDecisionPlanningOptions
Add more methods