methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration for Bottleneck Analysis.
Operations
Bottleneck Analysis
Paper illustration for Theory of Constraints.
Operations
Theory of Constraints
Paper illustration of a four-column Kanban board with limited ongoing work, a visible blocker and a review loop.
Engineering
Kanban
Paper illustration for Monte Carlo Forecasting.
Delivery
Monte Carlo Forecasting
Purposedifferent
For a flow that backs up at one point, the method looks for the capacity limit with the greatest leverage. It explains why extra effort elsewhere barely improves throughput.For a system that does not get faster despite effort, the method directs attention to the bottleneck. It concentrates improvement on the point that actually limits throughput.When work sits in too many parallel streams, throughput suffers and no one sees the bottlenecks. Kanban makes the flow of work visible and limits overload so a system becomes calmer and more predictable.Helps clarify scope, sequence, and delivery flow in concrete terms. It makes work, boundaries, and order steerable. The result is captured as Forecast Percentiles, Throughput Dataset, and Risk Communication.
Complexitydifferent
MediumHighMediumHigh
Timedifferent
1-3 h2-4 h Analyse, laufendOngoing30-90 min Setup, danach laufend
Participantsdifferent
3-83-122-121-8
Formatsame
Workshop + asyncWorkshop + asyncWorkshop + asyncWorkshop + async
Outputdifferent
Bottleneck Map, Flow Metrics, Improvement Options, Follow-up MeasuresConstraint Map, Improvement Plan, Flow MetricsKanban board, WIP policies, Flow metricsForecast Percentiles, Throughput Dataset, Risk Communication
Tags1 shared
FlowMeasurementConstraints
OperationsConstraintsFlowImprovement
FlowVisual managementDelivery
ForecastingFlowDelivery
Add more methods