View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Operations Bottleneck Analysis | ![]() Agile NoEstimates | ![]() Operations 5 Whys | ![]() Operations 8D Problem Solving |
|---|---|---|---|---|
Purposedifferent | For a flow that backs up at one point, the method looks for the capacity limit with the greatest leverage. It explains why extra effort elsewhere barely improves throughput. | When estimating slows a team down more than it helps, it shifts the focus to flow, small slices, and real lead time. It sorts work by value, risk, and delivery ability. The result is captured as Throughput Data, Flow Forecast, and Slicing Rules. | For a single, hard-to-explain deviation, the method exposes the causal chain behind the visible symptom. It keeps the cause open until a controllable condition emerges instead of a mere description. | For an acute quality or delivery problem, the method structures immediate protection and root cause work together. It keeps the situation stable while the actual cause is investigated cleanly. |
Complexitydifferent | Medium | Medium | Low | High |
Timedifferent | 1-3 h | laufend | 15-30 min | 1-6 Wochen |
Participantsdifferent | 3-8 | 2-12 | 2-6 | 4-10 |
Formatdifferent | Workshop + async | Workshop + async | Workshop | Workshop + async |
Outputdifferent | Bottleneck Map, Flow Metrics, Improvement Options, Follow-up Measures | Throughput Data, Flow Forecast, Slicing Rules | Root cause notes, Countermeasures | 8D Report, Containment Plan, Root Cause Evidence, Corrective Action Plan |
Tagsno overlap | FlowMeasurementConstraints | EstimationForecastingFlow | Root causeIncidentLeanProblem solving | QualityProblem solvingRoot cause |



