Criterion
Paper illustration for Bottleneck Analysis.
Operations
Bottleneck Analysis
Paper illustration for Monte Carlo Forecasting.
Delivery
Monte Carlo Forecasting
Paper illustration for Theory of Constraints.
Operations
Theory of Constraints
Paper illustration of a four-column Kanban board with limited ongoing work, a visible blocker and a review loop.
Engineering
Kanban
Purposedifferent
For a flow that backs up at one point, the method looks for the capacity limit with the greatest leverage. It explains why extra effort elsewhere barely improves throughput.Helps clarify scope, sequence, and delivery flow in concrete terms. It makes work, boundaries, and order steerable. The result is captured as Forecast Percentiles, Throughput Dataset, and Risk Communication.For a system that does not get faster despite effort, the method directs attention to the bottleneck. It concentrates improvement on the point that actually limits throughput.When work sits in too many parallel streams, throughput suffers and no one sees the bottlenecks. Kanban makes the flow of work visible and limits overload so a system becomes calmer and more predictable.
Complexitydifferent
MediumHighHighMedium
Timedifferent
1-3 h30-90 min Setup, danach laufend2-4 h Analyse, laufendOngoing
Participantsdifferent
3-81-83-122-12
Formatsame
Workshop + asyncWorkshop + asyncWorkshop + asyncWorkshop + async
Outputdifferent
Bottleneck Map, Flow Metrics, Improvement Options, Follow-up MeasuresForecast Percentiles, Throughput Dataset, Risk CommunicationConstraint Map, Improvement Plan, Flow MetricsKanban board, WIP policies, Flow metrics
Tags1 shared
FlowMeasurementConstraints
ForecastingFlowDelivery
OperationsConstraintsFlowImprovement
FlowVisual managementDelivery