methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration for Bottleneck Analysis.
Operations
Bottleneck Analysis
Paper illustration of a four-column Kanban board with limited ongoing work, a visible blocker and a review loop.
Engineering
Kanban
Paper matrix with six colored hat cards for information, feeling, value, caution, ideas and process control.
Facilitation
Six Thinking Hats
Decision Tree method illustration showing its working structure
Decision Making
Decision Tree
Purposedifferent
For a flow that backs up at one point, the method looks for the capacity limit with the greatest leverage. It explains why extra effort elsewhere barely improves throughput.When work sits in too many parallel streams, throughput suffers and no one sees the bottlenecks. Kanban makes the flow of work visible and limits overload so a system becomes calmer and more predictable.When a topic gets stuck too quickly in the same thinking mode, Six Thinking Hats deliberately separates the perspectives. This means facts, risks, creativity, and emotional signals get worked through one after another instead of mixed together.For decisions with follow-on paths and dependencies, a linear comparison is often not enough. A Decision Tree shows how options branch under conditions and which consequences hang on each branch.
Complexitysame
MediumMediumMediumMedium
Timedifferent
1-3 hOngoing45-90 min30-90 min
Participantsdifferent
3-82-124-121-6
Formatdifferent
Workshop + asyncWorkshop + asyncWorkshopWorkshop + async
Outputdifferent
Bottleneck Map, Flow Metrics, Improvement Options, Follow-up MeasuresKanban board, WIP policies, Flow metricsPerspective Notes, Decision Inputs, Action ItemsDecision Tree, Option Map, Assumption List
Tagsno overlap
FlowMeasurementConstraints
FlowVisual managementDelivery
FacilitationOptionsDecision
DecisionTreeOptions
Add more methods