methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration for Bottleneck Analysis.
Operations
Bottleneck Analysis
Paper illustration of a four-column Kanban board with limited ongoing work, a visible blocker and a review loop.
Engineering
Kanban
Paper illustration of Power-Interest Grid with a method-specific labelled workspace.
Facilitation
Power Interest Grid
Paper objective sheet with five SMART fields, baseline, target, owner, deadline and a complete result statement.
Product Strategy
SMART Goals
Purposedifferent
For a flow that backs up at one point, the method looks for the capacity limit with the greatest leverage. It explains why extra effort elsewhere barely improves throughput.When work sits in too many parallel streams, throughput suffers and no one sees the bottlenecks. Kanban makes the flow of work visible and limits overload so a system becomes calmer and more predictable.When many stakeholders compete for attention at once, the Power Interest Grid sorts them by influence and stake. It turns individual contributions into a visible selection. The result is captured as a Power Interest Grid and a stakeholder-specific strategy.When goals are formulated too generally, it brings measurability, direction, and timing into shape. It prevents intentions from staying without clear verification.
Complexitydifferent
MediumMediumLowLow
Timedifferent
1-3 hOngoing30-60 min15-30 min
Participantsdifferent
3-82-122-81-8
Formatdifferent
Workshop + asyncWorkshop + asyncWorkshopWorkshop + async
Outputdifferent
Bottleneck Map, Flow Metrics, Improvement Options, Follow-up MeasuresKanban board, WIP policies, Flow metricsPower Interest Grid, Strategy per StakeholderSMART Goal, Measurement Note, Deadline
Tagsno overlap
FlowMeasurementConstraints
FlowVisual managementDelivery
StakeholdersFacilitationAlignmentPlanning
GoalsPlanningMeasurementAlignment
Add more methods