Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration for Bottleneck Analysis.
Operations
Bottleneck Analysis
Paper illustration of a four-column Kanban board with limited ongoing work, a visible blocker and a review loop.
Engineering
Kanban
Paper illustration for Dot Estimation.
Facilitation
Dot Estimation
Paper illustration for NoEstimates.
Agile
NoEstimates
Purposedifferent
For a flow that backs up at one point, the method looks for the capacity limit with the greatest leverage. It explains why extra effort elsewhere barely improves throughput.When work sits in too many parallel streams, throughput suffers and no one sees the bottlenecks. Kanban makes the flow of work visible and limits overload so a system becomes calmer and more predictable.When size or effort can only be estimated roughly, Dot Estimation condenses the group's experience into a quick range. It turns individual contributions into a visible selection. The result is captured as an Effort Heatmap, Risk Signals, and Discussion Targets.When estimating slows a team down more than it helps, it shifts the focus to flow, small slices, and real lead time. It sorts work by value, risk, and delivery ability. The result is captured as Throughput Data, Flow Forecast, and Slicing Rules.
Complexitydifferent
MediumMediumLowMedium
Timedifferent
1-3 hOngoing5-20 minlaufend
Participantsdifferent
3-82-123-202-12
Formatdifferent
Workshop + asyncWorkshop + asyncWorkshopWorkshop + async
Outputdifferent
Bottleneck Map, Flow Metrics, Improvement Options, Follow-up MeasuresKanban board, WIP policies, Flow metricsEffort Heatmap, Risk Signals, Discussion TargetsThroughput Data, Flow Forecast, Slicing Rules
Tagsno overlap
FlowMeasurementConstraints
FlowVisual managementDelivery
EstimationEffortRisk
EstimationForecastingFlow