methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration for 8D Problem Solving.
Operations
8D Problem Solving
Paper illustration for Kepner-Tregoe
Operations
Kepner-Tregoe
Software Architecture Canvas method illustration showing its working structure
Architecture
Software Architecture Canvas
Paper illustration of the Lightning Decision Jam working structure.
Facilitation
Decision Jam
Purposedifferent
For an acute quality or delivery problem, the method structures immediate protection and root cause work together. It keeps the situation stable while the actual cause is investigated cleanly.For a disturbance that's hard to pin down, the method cleanly separates problem, cause, and decision. It reduces mixing when symptoms allow several interpretations.The Software Architecture Canvas reduces a system to the most important architecture decisions, constraints, and interfaces. It is useful when teams need a resilient overall picture quickly.When a decision is stuck, Decision Jam loosens the knot through structured separation of problem, idea, and selection. The format creates movement without jumping prematurely at the first seemingly elegant answer.
Complexitydifferent
HighHighLowLow
Timedifferent
1-6 Wochen2-8 h1-2 h60-90 min
Participantsdifferent
4-102-83-104-10
Formatdifferent
Workshop + asyncWorkshop + asyncWorkshopWorkshop
Outputdifferent
8D Report, Containment Plan, Root Cause Evidence, Corrective Action PlanProblem Analysis, Decision Analysis, Risk PlanArchitecture Canvas, Goals, Constraints, Quality AttributesProblem Cluster, Prioritized Challenge, Experiment
Tagsno overlap
QualityProblem solvingRoot cause
Problem solvingRoot causeDecisionOperations
CanvasArchitectureAlignmentWorkshop
FacilitationDecisionProblem solvingWorkshop
Add more methods