methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Visual Management workspace showing the question, observations, and next decision.
Operations
Visual Management
Game Day workspace showing the question, observations, and next decision.
DevOps
Game Day
Paper illustration for Dot Estimation.
Facilitation
Dot Estimation
Paper illustration for Failure Scenario Analysis.
Engineering
Failure Scenario Analysis
Purposedifferent
With high tempo and many parallel topics, the method makes status, deviations, and priorities visible at a glance. It reduces search effort and prevents what matters from getting lost in daily work.In preparing for rare incidents, the method tests response capability under controlled conditions. It shows where assumptions about stability, roles, and recovery are too optimistic.When size or effort can only be estimated roughly, Dot Estimation condenses the group's experience into a quick range. It turns individual contributions into a visible selection. The result is captured as an Effort Heatmap, Risk Signals, and Discussion Targets.In critical processes, it is not enough to plan only for the normal case. Failure Scenario Analysis looks at the path into failure and shows which failures, chains, and control gaps cause the most damage.
Complexitydifferent
LowHighLowMedium
Timedifferent
OngoingHalber Tag5-20 min1-3 h
Participantsdifferent
1-205-203-203-8
Formatdifferent
Workshop + asyncWorkshopWorkshopWorkshop
Outputdifferent
Visual Board, Status Indicators, Exception CuesSimulation Notes, Gaps List, Updated RunbooksEffort Heatmap, Risk Signals, Discussion TargetsFailure Scenarios, Risk Notes, Control Gaps, Test and Response Actions
Tagsno overlap
SignalsOperationsVisual management
ResilienceOperationsIncident
EstimationEffortRisk
FailureResilienceRisk
Add more methods