methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Visual Management workspace showing the question, observations, and next decision.
Operations
Visual Management
Paper illustration of Cost of Delay with its method-specific working model.
Delivery
Cost of Delay
Paper illustration for 8D Problem Solving.
Operations
8D Problem Solving
Paper fishbone diagram with a measurable effect at the head and six labeled cause branches.
Operations
Fishbone Diagram
Purposedifferent
With high tempo and many parallel topics, the method makes status, deviations, and priorities visible at a glance. It reduces search effort and prevents what matters from getting lost in daily work.Helps clarify scope, order, and delivery flow in concrete terms. It makes work, constraints, and sequence manageable. The result is captured as a Cost of Delay table and prioritization sequence.For an acute quality or delivery problem, the method structures immediate protection and root cause work together. It keeps the situation stable while the actual cause is investigated cleanly.When a problem has several possible contributing factors, the method sorts causes by cause areas. It prevents an initial hunch from blocking the view of other plausible drivers.
Complexitydifferent
LowHighHighLow
Timedifferent
Ongoing90-180 min1-6 Wochen30-60 min
Participantsdifferent
1-203-84-102-8
Formatdifferent
Workshop + asyncWorkshopWorkshop + asyncWorkshop
Outputdifferent
Visual Board, Status Indicators, Exception CuesCoD Table, Prioritization Sequence8D Report, Containment Plan, Root Cause Evidence, Corrective Action PlanFishbone Diagram, Cause Categories, Investigation Backlog
Tagsno overlap
SignalsOperationsVisual management
PrioritizationDeliveryEconomicsDecision
QualityProblem solvingRoot cause
Root causeQualityOperations
Add more methods