View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration for Dot Estimation.
Facilitation
Dot Estimation
Paper illustration for Bottleneck Analysis.
Operations
Bottleneck Analysis
Paper illustration for Failure Scenario Analysis.
Engineering
Failure Scenario Analysis
Paper illustration for Ideal Days.
Agile
Ideal Days
Purposedifferent
When size or effort can only be estimated roughly, Dot Estimation condenses the group's experience into a quick range. It turns individual contributions into a visible selection. The result is captured as an Effort Heatmap, Risk Signals, and Discussion Targets.For a flow that backs up at one point, the method looks for the capacity limit with the greatest leverage. It explains why extra effort elsewhere barely improves throughput.In critical processes, it is not enough to plan only for the normal case. Failure Scenario Analysis looks at the path into failure and shows which failures, chains, and control gaps cause the most damage.When effort needs to be thought of as real working time, it offers a simple common denominator for comparison. It sorts work by value, risk, and delivery ability. The result is captured as Ideal Day Estimates, Assumption Notes, and Capacity Caveats.
Complexitydifferent
LowMediumMediumLow
Timedifferent
5-20 min1-3 h1-3 h15-60 min
Participantsdifferent
3-203-83-82-9
Formatdifferent
WorkshopWorkshop + asyncWorkshopWorkshop + async
Outputdifferent
Effort Heatmap, Risk Signals, Discussion TargetsBottleneck Map, Flow Metrics, Improvement Options, Follow-up MeasuresFailure Scenarios, Risk Notes, Control Gaps, Test and Response ActionsIdeal Day Estimates, Assumption Notes, Capacity Caveats
Tagsno overlap
EstimationEffortRisk
FlowMeasurementConstraints
FailureResilienceRisk
EstimationEffortAgile